Thermal Fogger vs ULV Cold Fogger Application Guide
Thermal fogging and ULV cold fogging create different droplets and use different application methods. The target area, formulation, ventilation and label instructions should decide the equipment, not visible fog alone.
Start with the real job
Do not select equipment from one maximum number. Describe the normal job, the hardest condition and the limits around the work area. This makes quotations easier to compare and reduces configuration changes later.
Details to confirm
| Approved formulation and label | Measure or describe this item before selecting the final machine or attachment. |
|---|---|
| Indoor or outdoor target area | Measure or describe this item before selecting the final machine or attachment. |
| Required droplet range | Measure or describe this item before selecting the final machine or attachment. |
| Ventilation and re-entry controls | Measure or describe this item before selecting the final machine or attachment. |
| Carrier liquid and dilution | Measure or describe this item before selecting the final machine or attachment. |
| Cleaning and residue management | Measure or describe this item before selecting the final machine or attachment. |
Simple selection process
- Record the application and working environment.
- Measure the key load, depth, height or access limits.
- Check the machine and attachment as one system.
- List optional items and supplier assumptions separately.
- Approve the final specification before production.
Inquiry checklist
- Approved formulation and label
- Indoor or outdoor target area
- Required droplet range
- Ventilation and re-entry controls
- Carrier liquid and dilution
- Cleaning and residue management
Common questions
What information should be sent with an inquiry?
Send the application, working conditions, required dimensions, destination and any limits that affect access or operation.
Can one specification suit every site?
No. Terrain, material, duty cycle, attachment and local operating conditions can change the suitable configuration.
When are final specifications confirmed?
Final specifications are confirmed in the technical quotation and order documents before production.

