Machinery shipping planning begins with confirmed packed dimensions and weights. Disassembly, fluid or battery handling, corrosion protection, lifting points, securing, loose parts and destination transport must be coordinated before loading.
Relevant MERI Equipment and Resources
Packed dimensions, weights and center of gravity
View technical page →Cab, bucket, boom, wheels or attachments as applicable
View technical page →Condition, securing and container closure records
View technical page →Invoice, packing list and configuration references
View technical page →Technical Points to Confirm
| Container selection | Compare internal dimensions, door opening, payload and route limitations. |
|---|---|
| Disassembly plan | List removed components, fasteners, hoses, protection and reassembly instructions. |
| Securing | Use appropriate blocking, lashing and attachment points for the machine and loose parts. |
| Protection | Plan cleaning, drainage, corrosion control, weather protection and exposed surfaces. |
| Destination handling | Confirm unloading equipment, access, local transport and commissioning support. |
Information to Include with an Inquiry
- Machine configuration
- Packed dimensions and weights
- Destination port and country
- Container preference
- Disassembly limits
- Unloading and local transport plan
Request an Application-Based Recommendation
Review the related MERI guide, then send your application, site conditions, configuration requirements and destination through the technical quotation form.
This page supports preliminary selection. Final specifications, capacity, compatibility, service intervals and destination documentation are confirmed for the selected machine and configuration.

Packed for International Dispatch
This loading view shows packed remote-controlled equipment positioned inside an export container. Crating, steel-frame packing, moisture protection, securing points and unloading access are planned according to the selected machine and destination.